Started the implementation of artistic ideas and views on what is called 'HOME SWEET HOME'

Finally the Ideology!, stuffed in my neurons for over a couple of years in the pursuit of an Imaginative, Intuitive and Instinctive arrangement of red solid TABLE MOULD BRICKS on a layout that is already marked with an accuracy rate of around 93%-97%; with the help of a Design Engineer; along with the brick spread (cement along with SiO2 ) and the never ending suction of  H2O termed 'Curing' and after its own distinctive tenure starts the fixture windows and doors of the required choice of materials...undoubtedly we have a reached a considerable respective level called the Lintel stage...not to forget that a certain % of amount is to be paid to the ever busy person of course the CONTRACTOR (a person who pretends to be ever-busy coz he has so many houses started/starting to build at the same time!!).
                                                 Again the arrangement of bricks starts and the process is continued till we reach the most important work in any construction i.e. laying of the concrete roof which follows the process of Centring. The laying of the concrete roof is a non-stop process until the whole roof is covered with concrete. Still to my astonishment there is one work which every owner does after this stage i.e. providing Lunch to the workers who did the job for the day!!(In my words it’s treating them for their non-stop work). As far as I know this is one of the moments where the Contractor would be on Cloud 9 coz he has accomplished “THE” major work in construction also he would be most eagerly waiting for the next set of payment from the Owner.
 Next is the period of Curing the roof which I would call the Hibernation period coz the only work to be done for another 15 to 20 days is that the roof should straw-in as much amount of water as possible. Pheew a time for most of the souls-involved in building; to relax...well next is the haywire method of running the skeleton of the power supply just for the after effect of turning a Switch ON/OFF to do the assigned job, it isn’t over yet coz the next work is Flooring which certainly requires quite an amount of calculation and laying it precisely as marked (the after-effect here is to make the people FLOOR-STRUCK when they see/walk on it).
                                             Remaining work is the plastering of the brick arrangement and ultimately giving those plastered arrangements a colourful appearance only limited by our imagination...
In a nut-shell this is the Gist for constructing a house!!!

Although building a house is completed but converting it into a Home is left to the exhausted grey matter of the Owner and that includes the Interior Designing too.


Oops the PS here is we need to settle the payment with the Contractor.